DA Form 7467-R — MAIN POWER ENERGIZATION CHECKLIST (LRA)

main power energization checklist (lra)

Download the form

DA Form 7467-R is a DA series document issued for use across the Department of the Army. Official title: MAIN POWER ENERGIZATION CHECKLIST (LRA). Purpose: main power energization checklist (lra). The current edition carries the date 08/01/2002 and is listed with a publication status of ACTIVE. The form runs to 1 page(s) and contains approximately 200 entry fields.

The office of primary responsibility is USACE. Use is prescribed by TM 5-694, which defines when the form is raised and where it goes afterward. The form is normally completed by the subject of the entries or by administrative personnel maintaining the record, then reviewed and signed as the governing authority directs.

Distributed formats: PDF, XFDL. The layout is common to all of them; what varies is the method of entry. The pdf is the reference version. In the fillable pdf the entry areas are live objects that accept typing; in the printable version the same areas are inert and are filled by hand after printing.

The pdf displays in current browsers and in any reader application. For fillable use a full reader is preferable to a browser viewer, since viewers vary in whether entered data is retained. An xfdl file is available too. The format is IBM Lotus Forms, in use across Army form systems, and it opens only in the Lotus Forms Viewer.

Every format is available at no charge and without sign-up. Files are distributed exactly as published, with no changes to the page.

What the form asks for

  • Circuit
  • CondA
  • CondA_1
  • CondA_2
  • CondA_3
  • CondA_4
  • CondA_5
  • CondA_6
  • CondB
  • CondB_1
  • CondB_2
  • CondB_3
  • CondB_4
  • CondB_5
  • CondB_6
  • ContentArea1
  • CurrA
  • CurrA_1
  • CurrA_2
  • CurrA_3
  • CurrA_4
  • CurrB
  • CurrB_1
  • CurrB_2

The blocks are worked through in the order they appear on the sheet. At the head sit the identifying entries: name, identification number, unit, date. Because the filed record is indexed on these, they precede everything substantive.

Typed entry is made straight into the interactive fields. The tab key moves through them in the order set at build time, generally matching the reading order of the page. Boxes and buttons respond to a click; in an exclusive group, one selection cancels the others. Single-line fields do not wrap, and anything longer than the field width prints cut off although it may still display in full on screen. Extended text goes to remarks or a continuation sheet rather than into a narrow box.

The signature block is completed last and by hand or by an accepted electronic means. An unsigned form is a draft. Where a second signature is called for — reviewing official, approving authority, witness — each is applied in the order the blocks appear and dated as of application, not as of preparation. Blank mandatory fields are the most frequent defect; a nil entry is marked as such rather than left empty. Other recurring faults: transposed digits in identification numbers, dates in the wrong order of day and month, and stale copies retaining prior data because a working file was reused instead of a fresh blank form.

Forms that collect personal information bear a Privacy Act statement covering authority, purpose, routine uses, and whether the disclosure is required or optional. Reading it precedes completion. Once filled, the document contains personal data and is subject to the handling and storage rules that attach to such records.

The completed form is routed as the governing authority prescribes: to the office named in the directive, through the unit administrative channel, or into the individual's file, depending on the case. A copy is retained by the preparer. Filing and retention follow the records schedule applicable to the series rather than local practice.

Associated documents are located through the series and number scheme. Forms in the DA series with the same proponent or the same prescribing directive tend to be used as a set, and any form named on the face of another normally accompanies it. Continuations, cover sheets, and transmittals fall into this category and are gathered before the package is sent.

Revision by the proponent supersedes an edition. Version is read from the edition date printed on the form itself, and a stored copy is compared against the current edition before it is used again. Documents already executed under an earlier edition are not redone because of the change.

The documents on this page are reproductions of published Department of the Army forms, offered for download. This is an independent site with no connection to the Department of the Army and no authority to issue forms. Nothing stated is legal advice, and no assurance is given regarding acceptance by any office. Doubts about a specific entry, requirement, or eligibility are resolved by the proponent or by the servicing administrative office.

Questions and answers

What is DA Form 7467-R?
MAIN POWER ENERGIZATION CHECKLIST (LRA)
Which edition is current?
08/01/2002
Who is responsible for this form?
USACE
In which formats can it be downloaded?
PDF, XFDL, PDF

Publisher notes

  1. 41-ITEM ALSO PRODUCED IN ELECTRONIC MEDIA,